Menu

PAIMANA Project Assessment, Infrastructure Monitoring and Analytics for Nation-Building (UPSC/RAS/PSI)

Read in:
  • Nodal Ministry- Ministry of Statistics and Programme Implementation (MoSPI)
  • Technical Infrastructure Partner- National Informatics Centre (NIC)

Core Mandate

  1. System Replacement- Replaced the legacy OCMS-2006 (Online Computerized Monitoring System) to eliminate delays, cost overruns, and reporting gaps in major national infrastructure assets.
  2. Monitored Scope- Tracks ongoing Central Sector infrastructure projects with an individual capital outlay costing ₹150 crore or more.
  3. Central Repository Integration (PAIMANA-CRIP)- On July 8, 2026, MoSPI launched the PAIMANA-CRIP module, replacing DPIIT’s Integrated Project Monitoring Portal (IPMP). It acts as a single Central Repository feeding real-time project data to review portals like PRAGATI (Pro-Active Governance and Timely Implementation) and the Project Monitoring Group (PMG).

Architectural Workflow & API-Driven Governance

  1. Data Integration Methods- Information is updated regularly by over 20+ Ministries, Departments, and Implementing Agencies via direct data entry or automated API (Application Programming Interface)integration.
  2. Automation Scale- Over 60% of all monitored projects update automatically in real time via direct API connections linked to internal Ministry MIS platforms.
  3. Cross-Portal Interoperability- Operates in sync with DPIIT’s India Industrial Land Bank (IIG) and IPMPportals to ensure a single cross-sector view of physical progress.

Performance Monitoring Dashboard & 165 Indicators


  • MoSPI expanded the portal with a specialized Performance Monitoring Dashboardcovering 165 standardized indicators (54 added in recent expansions) across 6 core sub-sectors-

A. Framework Knowledge Partners & Alignment

  1. NIPFP Collaboration- Built on an indicator framework designed in consultation with the National Institute of Public Finance and Policy (NIPFP).
  2. DEA Harmonized Master List- Aligns directly with the Department of Economic Affairs' (DEA) Harmonized Master List (HML) of Infrastructure (2022).
  3. Index Non-Overlap- Streamlined to avoid duplicate calculations against classical macroeconomic indices like the Index of Industrial Production (IIP) and Eight Core Industries.

The Revamped Multi-Dimensional Monitoring Approach-

  • The platform marks a structural shift from simply measuring physical production/outputs to evaluating multi-dimensional performance across 5 Core Dimensions of Governance-

Performance Dimension

Core Analytical Objective

1. Access

Measures how broadly and geographically available infrastructure assets are to citizens.

2. Quality

Evaluates the operational usefulness, structural safety, and reliability of the infrastructure.

3. Fiscal Cost & Revenue

Assesses financial resource allocation efficiency, cost overruns, and revenue returns.

4. Utilization

Evaluates how efficiently capacity is utilized relative to its defined design capacity.

5. Affordability

Determines whether the services generated are economically accessible to the populace.

Macro Snapshot of Ongoing Central Projects

  1. Total Project Outlay- Monitors 1,847 ongoing Central Sector projects carrying a combined revised cost of ₹40.54 lakh crore across 17 Ministries.
  2. Cumulative Expenditure- Realized spending reached ₹21.97 lakh crore (~54.18% of total revised costs), indicating steady financial execution.
  3. Project Scale Categorization-

    a.) Mega Projects (≥ ₹1,000 Crore)- 769 projects worth ₹30.51 lakh crore.
    b.) Major Projects (₹150 Crore to ₹1,000 Crore)- 1,078 projects worth ₹5.10 lakh crore.

  4. Physical Progress Thresholds- Approximately 709 projects (~39%) have crossed 80% physical completion, while 337 projects (~19%) have passed 80% financial completion.

Strategic Significance

  1. Controlling Time & Cost Overruns- Real-time flash reports and bottleneck tracking prevent fiscal leakages and compounding interest delays on high-value public capital.
  2. Evidence-Based Policymaking- Moves administrative reviews from manual post-facto appraisals to predictive, data-driven analytics.
  3. Viksit Bharat@2047 Pillar- Serves as the primary operational dashboard ensuring that long-term connectivity, energy, and urban infrastructure targets remain on track for Viksit Bharat@2047.